Aircraft handling at Copenhagen Kastrup Airport

EKCH / CPH · Copenhagen, Denmark
Longest runway
11,811 ft
Runways
3
Country
Denmark
LFS ops desk
24 / 7
Quick answers
Does LFS handle aircraft at Copenhagen Kastrup Airport (EKCH / CPH)?
LFS can request ground handling at EKCH through a local handling provider where one is available. Our ops desk runs 24/7; on-site service hours, handler availability and airport access are confirmed with the authority and handler before the trip.
How much notice does EKCH need?
Standard trips are best filed 24–48 hours ahead. AOG, medevac and humanitarian flights are worked immediately, day or night.
What is a typical turnaround at EKCH?
Turnaround depends on aircraft type and services ordered; LFS confirms a realistic ground time with the handler when the trip is filed.
Can LFS arrange fuel and permits for EKCH too?
Yes — Jet A-1 uplift, landing and overflight permits, slots/PPR, crew hotels and transport are all arranged on one trip file.
How do I request handling at EKCH?
Send the trip to OPS@LFS.AERO or call the 24/7 desk on +973 1330 0313.
Served through the LFS agent network

LFS coordinates EKCH through vetted ground handling agents we appoint and supervise. You deal with one LFS controller for the whole trip; we hold the agent to our turnaround, fuel and reporting standards and audit the invoice before it reaches you.

Aircraft handled

20 types coordinated at EKCH

Wide-body cargo

Boeing 747-8F
B748 · 447.7 t MTOW
Length OK (indicative)
Boeing 747-400F
B744 · 396.9 t MTOW
Length OK (indicative)
Boeing 777F
B77L · 347.8 t MTOW
Length OK (indicative)
Boeing 767-300F
B763 · 186.9 t MTOW
Length OK (indicative)
McDonnell Douglas MD-11F
MD11 · 286 t MTOW
Length OK (indicative)
Airbus A330-200F
A332 · 233 t MTOW
Length OK (indicative)
Antonov An-124 Ruslan
A124 · 405 t MTOW
Length OK (indicative)
Ilyushin Il-76
IL76 · 210 t MTOW
Length OK (indicative)

Narrow-body cargo

Boeing 737-800BCF
B738 · 79 t MTOW
Length OK (indicative)
Airbus A321P2F
A321 · 93.5 t MTOW
Length OK (indicative)
ATR 72-600F
AT72 · 23 t MTOW
Length OK (indicative)

Wide-body passenger

Airbus A380-800
A388 · 575 t MTOW
Length OK (indicative)
Boeing 747-400
B744 · 396.9 t MTOW
Length OK (indicative)
Boeing 777-300ER
B77W · 351.5 t MTOW
Length OK (indicative)
Boeing 787-9 Dreamliner
B789 · 254 t MTOW
Length OK (indicative)
Airbus A350-900
A359 · 280 t MTOW
Length OK (indicative)

Narrow-body passenger

Airbus A320
A320 · 78 t MTOW
Length OK (indicative)
Boeing 737-800
B738 · 79 t MTOW
Length OK (indicative)
Boeing 737 MAX 8
B38M · 82.2 t MTOW
Length OK (indicative)
Embraer E190
E190 · 51.8 t MTOW
Length OK (indicative)
Trip to EKCH?

Handling, fuel, permits and slots at EKCH — answered in under 60 minutes.

Send registration, aircraft type, route and dates. You get one reply with the ramp plan, permit lead time, slot position and a fuel price for Copenhagen Kastrup Airport.

Fast track
Request EKCH support
EKCH — Copenhagen Kastrup Airport · Denmark

Acknowledged in under 60 minutes during working hours · immediately for AOG and medevac.

Operating into Copenhagen: local notes and contacts

What actually shapes a turnaround at Copenhagen Kastrup Airport (EKCH / CPH) — the permit chain in Denmark, the field's own constraints, and who to call locally.

Local handling notes

  • Permits and entry clearances for Denmark run through the Danish Civil Aviation and Railway Authority. LFS files against two working days for non-EU non-scheduled flights, and short-notice requests are worked directly with the authority rather than left in a queue.
  • Schengen immigration rules; Danish customs clears cargo and crew effects on arrival from outside the EU. LFS sends the general declaration, crew list and passenger manifest to the handling agent before you land.
  • Copenhagen Kastrup Airport has 3 runways with a longest of 11,811 ft, so aircraft type is rarely the limiting factor here — ramp availability, parking and slot timing usually are. LFS confirms stand and equipment before the permit is filed.
  • Between roughly November and March, de-icing and snow clearance drive the turnaround at Copenhagen more than paperwork does. LFS confirms de-icing fluid availability and holdover timing with the handler as part of the ramp plan.
  • Fuel, catering, crew transport and hotac at Copenhagen are arranged on one LFS trip file, so you get one point of contact and one reconciled invoice instead of chasing each supplier at the field.

Latest from LFS on Copenhagen and Denmark