Aircraft handling at New Gwadar International Airport

OPGW / GWD · Gurandani, Pakistan
Longest runway
12,000 ft
Runways
1
Country
Pakistan
LFS ops desk
24 / 7
Quick answers
Does LFS handle aircraft at New Gwadar International Airport (OPGW / GWD)?
LFS can request ground handling at OPGW through a local handling provider where one is available. Our ops desk runs 24/7; on-site service hours, handler availability and airport access are confirmed with the authority and handler before the trip.
How much notice does OPGW need?
Standard trips are best filed 24–48 hours ahead. AOG, medevac and humanitarian flights are worked immediately, day or night.
What is a typical turnaround at OPGW?
Turnaround depends on aircraft type and services ordered; LFS confirms a realistic ground time with the handler when the trip is filed.
Can LFS arrange fuel and permits for OPGW too?
Yes — Jet A-1 uplift, landing and overflight permits, slots/PPR, crew hotels and transport are all arranged on one trip file.
How do I request handling at OPGW?
Send the trip to OPS@LFS.AERO or call the 24/7 desk on +973 1330 0313.
Served through the LFS agent network

LFS coordinates OPGW through vetted ground handling agents we appoint and supervise. You deal with one LFS controller for the whole trip; we hold the agent to our turnaround, fuel and reporting standards and audit the invoice before it reaches you.

Aircraft handled

20 types coordinated at OPGW

Wide-body cargo

Boeing 747-8F
B748 · 447.7 t MTOW
Length OK (indicative)
Boeing 747-400F
B744 · 396.9 t MTOW
Length OK (indicative)
Boeing 777F
B77L · 347.8 t MTOW
Length OK (indicative)
Boeing 767-300F
B763 · 186.9 t MTOW
Length OK (indicative)
McDonnell Douglas MD-11F
MD11 · 286 t MTOW
Length OK (indicative)
Airbus A330-200F
A332 · 233 t MTOW
Length OK (indicative)
Antonov An-124 Ruslan
A124 · 405 t MTOW
Length OK (indicative)
Ilyushin Il-76
IL76 · 210 t MTOW
Length OK (indicative)

Narrow-body cargo

Boeing 737-800BCF
B738 · 79 t MTOW
Length OK (indicative)
Airbus A321P2F
A321 · 93.5 t MTOW
Length OK (indicative)
ATR 72-600F
AT72 · 23 t MTOW
Length OK (indicative)

Wide-body passenger

Airbus A380-800
A388 · 575 t MTOW
Length OK (indicative)
Boeing 747-400
B744 · 396.9 t MTOW
Length OK (indicative)
Boeing 777-300ER
B77W · 351.5 t MTOW
Length OK (indicative)
Boeing 787-9 Dreamliner
B789 · 254 t MTOW
Length OK (indicative)
Airbus A350-900
A359 · 280 t MTOW
Length OK (indicative)

Narrow-body passenger

Airbus A320
A320 · 78 t MTOW
Length OK (indicative)
Boeing 737-800
B738 · 79 t MTOW
Length OK (indicative)
Boeing 737 MAX 8
B38M · 82.2 t MTOW
Length OK (indicative)
Embraer E190
E190 · 51.8 t MTOW
Length OK (indicative)
Trip to OPGW?

Handling, fuel, permits and slots at OPGW — answered in under 60 minutes.

Send registration, aircraft type, route and dates. You get one reply with the ramp plan, permit lead time, slot position and a fuel price for New Gwadar International Airport.

Fast track
Request OPGW support
OPGW — New Gwadar International Airport · Pakistan

Acknowledged in under 60 minutes during working hours · immediately for AOG and medevac.

Operating into Gurandani: local notes and contacts

What actually shapes a turnaround at New Gwadar International Airport (OPGW / GWD) — the permit chain in Pakistan, the field's own constraints, and who to call locally.

Local handling notes

  • Permits and entry clearances for Pakistan run through the Pakistan Civil Aviation Authority (PCAA). LFS files against five to seven working days, with security clearance running in parallel, and short-notice requests are worked directly with the authority rather than left in a queue.
  • Crew visas and security clearance are checked closely; documentation must match the permit exactly. LFS sends the general declaration, crew list and passenger manifest to the handling agent before you land.
  • New Gwadar International Airport works from a single runway of 12,000 ft, so a closure, inspection or a disabled aircraft has no immediate alternative. LFS builds a diversion and re-timing plan into every movement at this field.
  • Fuel, catering, crew transport and hotac at Gurandani are arranged on one LFS trip file, so you get one point of contact and one reconciled invoice instead of chasing each supplier at the field.