Operations Control CenterAN-124, IL-76, B747F, B777F and narrow-body freighters across the Middle East, Africa and Central Asia — MTOW permits, freighter slots, main-deck loading, dangerous goods and a ramp agent for the full turnaround.
A cargo charter fails on the ground far more often than in the air. The stand does not take the wingspan, the field has no main-deck loader, the pavement will not carry the ACN, the night curfew closes before the offload finishes, or the permit is filed as a passenger movement and rejected. LFS checks every one of those against the real station before the charter is committed, then runs the turnaround.
Needs MTOW/heavy-aircraft approval at most Gulf and African fields, a surveyed ramp position and pavement check (PCN vs ACN) before slot confirmation.
Noise-compliant variant only at Stage 4 restricted airports. Night curfew waivers and operator-specific permits are usually the critical path.
Requires a main-deck capable loader (widebody K-loader) and a nose-door compatible stand — not available at every gateway.
Stand and loader availability is the usual constraint at secondary fields; LFS confirms both before the slot is filed.
Widely accepted at Gulf and African gateways with standard widebody handling.
The practical option into regional and feeder fields where widebody stands or loaders do not exist.
Overflight and landing clearances for heavy and outsized freighters are filed differently: MTOW declarations, cargo manifests with commodity detail, and in several states a separate cargo or charter approval on top of the flight permit. We file all of it as one package.
Freighter slots sit outside the passenger pool at most coordinated airports. We negotiate the slot pair, the PPR and, where the schedule demands it, the night-curfew waiver — with the noise certificate attached up front.
Stand dimensions, pavement strength, main-deck loader availability, high-reach equipment and tow capability are checked at the actual station before the charter is confirmed, so the aircraft is never sold into a field that cannot unload it.
Main-deck K-loaders, scissor lifts, roller beds, spreader plates for concentrated loads, cranes and forklifts arranged to the tonnage. Loadmaster liaison on shoring, tie-down schemes and centre-of-gravity limits.
IATA DGR Class 1 to 9 acceptance, NOTOC preparation, segregation checks and authority notification. For project cargo, route surveys for oversize pieces and coordination with the ground transport leg.
Contract fuel releases or card settlement, crew transport, hotac and visa support, catering, GPU and ASU, plus a ramp agent on station for the full turnaround with a timestamped movement report.
LFS does not own or operate freighter aircraft and does not sell cargo capacity. We support the operators, charter brokers, freight forwarders and logistics teams who do: the airline flies the aircraft, the broker or forwarder sells the movement, and LFS coordinates the permits, slots, handling, fuel and ramp supervision that the flight needs at each station.
If you are looking to buy space on a cargo aircraft, a charter broker or the operator is the right first contact. If you already have the aircraft and need the routing to work on the ground, that is where the LFS desk comes in.
Runway length and strength, stand size, pavement rating, loader availability, opening hours and curfews are checked for every airport on the routing. Since ICAO introduced the ACR-PCR method for reporting pavement strength, some States publish ACR/PCR values while others still show ACN/PCN during the transition, so the current AIP entry is checked for each airport.
Cargo charters are often non-scheduled commercial flights and many States require a specific permit for them, separate from passenger charters. Weight, cargo description and dangerous goods details are commonly requested. See urgent flight permits and overflight permits.
Main-deck loaders, high loaders, forklifts, cranes and qualified loading staff are confirmed in writing with the handler. Where specialist equipment must come from off airport, delivery timing becomes part of the plan.
Fuel releases, crew hotels and transport, and a ramp coordinator for the turnaround are added to the same trip file. Long cargo routings often need a technical stop for fuel or a crew change.
Dangerous goods by air are governed by the ICAO Technical Instructions and, for most operators, the IATA Dangerous Goods Regulations. The shipper declares the goods, the operator accepts them, and the States on the route may require their own approvals or exemptions. LFS passes the declared classes and UN numbers to the authorities and handlers that need them, and flags where a State requires prior approval. We do not classify or accept dangerous goods ourselves.
Outsize items, such as industrial machinery, energy-sector equipment or vehicles, bring their own checks: door dimensions, floor loading, tie-down plans and the handling equipment available at both ends. Live animal flights follow the IATA Live Animals Regulations and destination veterinary rules.
Aircraft type and registration, the full routing with UTC times, payload weight and number of pieces, the largest piece dimensions and weight, a cargo description, dangerous goods details if any, and the services needed at each station. The more complete the first message, the faster the desk can say what is feasible. For wider freight work see cargo and freight and our guide to cargo aircraft ground handling in the Middle East.
No. LFS does not operate aircraft or sell cargo capacity. We provide flight support (permits, slots, handling, fuel and ramp coordination) for operators, brokers and forwarders running the charter.
We pass the declared dangerous goods information to the authorities and handlers on the route and flag where prior State approval is needed. Classification and acceptance remain with the shipper and the operator.
As early as possible. Permit requirements, loader availability and pavement checks vary by station, and some approvals take longer than others. The desk confirms what is realistic for your dates.
Reviewed 25 October 2026. Current AIP, NOTAMs, authority requirements and written provider confirmations govern each flight.
Share your route, aircraft, UTC schedule and the services you need. The LFS desk will review the request and confirm documentation, availability and terms. Permits and access remain subject to approval by the relevant authority.
Request cargo charter support