Aircraft handling at Capital International Airport

HECP / CCE · New Cairo, Egypt
Longest runway
11,980 ft
Runways
3
Country
Egypt
LFS coverage
24 / 7
Quick answers
Does LFS handle aircraft at Capital International Airport (HECP / CCE)?
Yes. LFS arranges ground handling at HECP 24/7 through a vetted local handling agent, including ramp, passenger, cargo and crew services.
How much notice does HECP need?
Standard trips are best filed 24–48 hours ahead. AOG, medevac and humanitarian flights are worked immediately, day or night.
What is a typical turnaround at HECP?
Turnaround depends on aircraft type and services ordered; LFS confirms a realistic ground time with the handler when the trip is filed.
Can LFS arrange fuel and permits for HECP too?
Yes — Jet A-1 uplift, landing and overflight permits, slots/PPR, crew hotels and transport are all arranged on one trip file.
How do I request handling at HECP?
Send the trip to OPS@LFS.AERO or call the 24/7 desk on +973 1330 0313. Requests are acknowledged within 60 minutes, immediately for AOG.
Served through the LFS agent network

LFS coordinates HECP through vetted ground handling agents we appoint and supervise. You deal with one LFS controller for the whole trip; we hold the agent to our turnaround, fuel and reporting standards and audit the invoice before it reaches you.

Related UAE hubs
Aircraft handled

20 types coordinated at HECP

Trip to HECP?

Handling, fuel, permits and slots at HECP — answered in under 60 minutes.

Send registration, aircraft type, route and dates. You get one reply with the ramp plan, permit lead time, slot position and a fuel price for Capital International Airport.

Fast track
Request HECP support
HECP — Capital International Airport · Egypt

Acknowledged in under 60 minutes during working hours · immediately for AOG and medevac.

Operating into New Cairo: local notes and contacts

What actually shapes a turnaround at Capital International Airport (HECP / CCE) — the permit chain in Egypt, the field's own constraints, and who to call locally.

Local handling notes

  • Permits and entry clearances for Egypt run through the Egyptian Civil Aviation Authority (ECAA). LFS files against three to four working days for landing permits, two for overflight, and short-notice requests are worked directly with the authority rather than left in a queue.
  • Crew and passenger details, and often the flight's purpose, are filed in advance; security clearance is separate from the permit. LFS sends the general declaration, crew list and passenger manifest to the handling agent before you land.
  • Capital International Airport has 3 runways with a longest of 11,980 ft, so aircraft type is rarely the limiting factor here — ramp availability, parking and slot timing usually are. LFS confirms stand and equipment before the permit is filed.
  • Fuel, catering, crew transport and hotac at New Cairo are arranged on one LFS trip file, so you get one point of contact and one reconciled invoice instead of chasing each supplier at the field.

Latest from LFS on New Cairo and Egypt