Flight dispatcher at a desk with screens showing route charts and weather radar over the Arabian Gulf

LFS · Flight support services

Aircraft flight planning services for the Middle East

LFS prepares and files flight plans for aircraft operating to, from and across the Middle East. The dispatch desk builds routes that respect current airspace restrictions and permit conditions, files ICAO flight plans, supplies weather and NOTAM briefings and refiles when the schedule or route changes. The operator and the pilot-in-command keep final responsibility for the flight and for accepting the plan.

Representative aviation illustration; not a photograph of a specific airport, LFS facilities or personnel.

Why Middle East routes need careful planning

The Middle East connects Europe, Africa, South Asia and the Far East, and many long-range business aviation and charter routes cross it. The airspace is also one of the most changeable in the world. Conflict-related closures, military activity, temporary restricted areas and route changes can appear at short notice through NOTAMs and state advisories, and some flight information regions have specific entry, exit and permit conditions.

A route that was valid last month can be unsuitable today. Good flight planning in the region therefore starts with the current picture: active NOTAMs, conflict-zone information published by aviation authorities and the operator's own risk policy. The route then has to match the overflight permits that have actually been granted, because a permit is usually tied to specific entry and exit points and times.

What the LFS flight planning service includes

Operators can use LFS for a single sector or for an entire regional itinerary. The service is built around the operator's aircraft performance data and operational policies, not a generic template.

Core deliverables

A typical flight planning package includes:

  • Route construction respecting current airspace restrictions and permit entry and exit points
  • Operational flight plan with fuel, times and alternates based on your performance data
  • ICAO ATC flight plan filing and confirmation of acceptance
  • Weather package: METAR, TAF, significant weather and winds aloft
  • NOTAM briefing for departure, destination, alternates and en-route FIRs
  • Refiling and delay messages when the schedule or route changes

Coordination with permits and handling

Because LFS also arranges overflight and landing permits, the desk checks that the filed route, times and registration match the permits issued. If an authority approves a different entry point or time window, the plan is adjusted before filing rather than after a rejection.

Planning considerations specific to the region

Summer heat affects take-off performance at many Gulf and inland airports, and operators should check runway length, temperature and weight limits early. Winter brings fog and low visibility to some coastal airports in the early morning, which affects alternate selection and fuel planning. Dust and sand events can reduce visibility at any time of year.

Diversion options matter on long overwater and desert sectors. LFS considers which alternates are suitable for the aircraft type, whether they are open at the planned time and whether a permit or handling would be available if the aircraft had to land there. For operators planning for this, see aircraft diversion handling and trip support.

Some states require flight plan addressing to additional units, or have special procedures for state, military or diplomatic flights. LFS applies these when they are known to apply to the flight and asks the operator to confirm any company-specific requirement.

How a flight planning request works

Send the aircraft type, registration, departure and destination, preferred times, payload, and any route or airspace preferences. If you already hold permits, include the references. LFS confirms the route options and constraints, then issues the operational plan and briefing package in the agreed format before the crew report time.

Once filed, the desk monitors the flight plan for acceptance messages and relevant new NOTAMs. If the departure is delayed, LFS sends the delay message or refiles. Operators who want continuous monitoring during the flight can add business aviation flight watch. For filing-only support, see international flight plan filing.

Responsibility and limits

LFS prepares the plan using the information available at the time and the data the operator supplies. It does not guarantee that airspace will remain open or that a route will be accepted by every unit, and it does not replace the operator's own operational control. The pilot-in-command reviews and accepts the plan, and the operator's risk assessment decides whether a route is flown.

What to include in your enquiry

For flight planning, include the aircraft performance profile you use, your company fuel policy, the planned payload and any airspace your company avoids. Say whether you need only the ATC filing or a full operational plan with weather and NOTAM briefings.

Send the request through the existing LFS flight-support form. Give the operator name, aircraft type and registration, maximum take-off weight, every sector including positioning legs, UTC times, crew and passenger numbers and the purpose of flight. Say which sectors are confirmed and which are still provisional. A useful reply from LFS separates an indicative quotation from accepted authority, airport and provider references, so you always know which parts of the trip are actually approved. For a quick question before you have a schedule, contact flight operations.

Frequently asked operational questions

Can LFS file ICAO flight plans for Middle East routes?

Yes. LFS prepares and files ICAO ATC flight plans and confirms acceptance, and can refile or send delay messages when the schedule changes.

How does LFS handle airspace closures?

The desk reviews current NOTAMs and published airspace advisories when building the route and while the plan is active, and proposes an alternative route if a closure affects it. The operator decides whether to accept it.

Do you check the route against my permits?

Yes. LFS checks that the filed route, times and registration match the overflight and landing permits issued, and adjusts the plan if an authority approved different conditions.

Does LFS use my aircraft performance data?

Operational plans are built using the aircraft type and the performance data and fuel policy the operator provides.

Who is responsible for the final flight plan?

The operator and the pilot-in-command. LFS prepares and files the plan, but the crew reviews and accepts it under the operator's operational control.

Can I get only weather and NOTAM briefings?

Yes. Briefing packages can be supplied without full flight planning if your team prefers to prepare the plan itself.

Is the service available for short-notice flights?

The desk works 24 hours a day. Send the request as early as possible; what can be delivered depends on the route, permits and the information available.

Authority and airport references

Reviewed 18 November 2026. Current AIPs, NOTAMs, authority decisions and written airport and provider acceptance govern the flight.

Request flight support from LFS

Provide your operator, aircraft, route, UTC schedule and required services through the existing LFS enquiry process, and distinguish confirmed sectors from provisional plans.